Phase 1 Fundraising now
Prepare the site
Site development and building pad preparation. The structural foundation begins in Phase 2.
- Estimated cost
- $1.2M – $1.4M
- Estimated time
- 10–14 months
- Land and building pad: site preparation, grading, and pad
- Access and pavement: driveway, fire lane, parking, and curbs
- Stormwater: underground storage and drainage
- Site utilities: water, sewer, and plumbing to the building
- Electrical and lighting: site power and exterior lighting
- Outdoor and service areas: playground, landscape, and dumpster
Outcome: A ready building pad with 113 parking spaces, a larger front plaza, a bigger backyard, and a safer play area.